Capstone repairs slim Mantoverde copper output
The company expects a four-week repair window and estimates a 3,000–4,000 tonne reduction in copper-in-concentrate during the period.
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed