Brazil President says Amazon rainforest reserve should be opened to mining

Aerial view of the Amazon Rainforest, near Manaus, the capital of the Brazilian state of Amazonas. (Image courtesy of Neil Palmer | Amazon4.)

Brazilian President Jair Bolsonaro said on Friday the country could open a vast reserve in the Amazon rainforest to mining, a move attempted by his predecessor that was quickly rescinded following an international environmental outcry.

The National Reserve of Copper and Associates (Renca) occupies roughly 17,800 square miles (46,100 square kilometers), an area slightly larger than Denmark, that is thought to be rich in gold, copper, iron ore and other minerals.

“Let’s talk about Renca. Renca is ours,” Bolsonaro said at a televised event in northern Amapá state, home to part of the reserve.

The National Reserve of Copper and Associates (Renca) occupies roughly 17,800 square miles and is thought to be rich in gold, copper, iron ore and other minerals

“Let’s use the riches that God gave us for the well-being of our population,” Bolsonaro said. “You won’t get any trouble from the Environment Ministry, nor the Mines and Energy Ministry nor any other because our ministries, for the first time in the Republic, all understand and speak the same language: A better Brazil for all of us.”

Mining has been off limits in the Renca, located in the northern states of Pará and Amapá, since it was established in 1984 to protect against perceived threats from foreign miners.

The reserve was established by a presidential decree and therefore can be revoked by the president without Congressional approval.

Bolsonaro’s predecessor, Michel Temer, abolished the reserve in 2017, only to reinstate it the following month after an international backlash from environmentalists who said it would lead to a spike in deforestation.

“Brazil already had the chance to express its views on the opening of Renca to development, and public opinion was not favorable,” said Adriana Ramos, legal and policy adviser at the Brazilian nongovernmental organization Instituto Socioambiental (ISA), in a statement.

“But the government prefers to announce controversial and outdated initiatives instead of new ideas for sustainable development in the Amazon,” she said.

The Amazon, about 60% of which lies in Brazil, is the world’s largest tropical rainforest. It is a bulwark against global warming and is sometimes called the “lungs of the world” because of the vast amounts of carbon dioxide its trees absorb.

(Reporting by Pedro Fonseca Writing by Jake Spring Editing by Bill Berkrot)

1774 0

More Latin America News

Latest Stories

Cote d’Ivoire gold output to double in 2 years

Ivory Coast can double gold output within two years from the current 7 tonnes per year as more miners seek to tap its estimated 200,000 tonnes of reserves, an industry association official said on Friday. "We can double production very quickly within the next two years, because there are several companies carrying out exploration, and it is likely that new sites could start production," said Michel Mian, president of the Interprofessional Mining Group (GPMCI) and head of Australia's Newcrest (NCM.AX) Ivorian operations.

Canada Lithium confirms Québec lithium mine viability; schedules site construction in Q3, 2011

Canada Lithium Corp. (TSX: CLQ; U.S. OTC: CLQMF) announced today the results of the updated feasibility study for the development of a mine and lithium carbonate processing facility at its Québec Lithium Project near Val d’Or, Québec. A National Instrument 43-101 compliant technical report respecting the updated feasibility study will be filed on SEDAR within 14 days. The June technical report will replace the technical report dated January 5, 2011, that was prepared in respect of a feasibility study for the project that was completed in December, 2010.

SIGN UP FOR OUR DAILY NEWSLETTER

Rhodium to rise as much as 35% as car sales accelerate, SA mine output slumps

Rhodium will climb as much as 35% to $2,800 an ounce by the end of the year on increased carmaker demand and production difficulties for mining companies in South Africa where the metal is produced as a byproduct of platinum mining, according to a report by Standard Bank released on Monday. Mainly used in emissions reducing converters and in the chemical and glass industries rhodium is down 14% this year after three annual surpluses but jumped 21% in the week after Deutsche Bank introduced a physically backed exchange-traded product at the end of May. The price of rhodium hit an all-time record high above $10,000 in 2008.

ATAC Resources Ltd. drills significant new silver-lead-zinc discovery at its Ocelot target, Rackla Gold Project, Yukon

ATAC Resources Ltd. (TSX VENTURE:ATC) is pleased to announce it has made a significant silver-lead-zinc discovery at the Ocelot target beneath a known but previously undrilled surface gossan. The target is located within the Rau Trend in the western portion of ATAC's 100% owned Rackla Gold Project in the Keno Hill Mining District, Canada's second largest primary silver producer. Image by ATAC Resources Ltd.

Spike in labour costs could put a drag on oil sands investments

The Financial Post reports according to a new outlook from the Construction Owners Association of Alberta, the expected future labour need for 2011 is up significantly from this time last year. At the same time, the Construction Sector Council recently published a forecast that suggests that future trades industry labour supply will be limited. An 2011 report by Peters & Co., an oil sands investment house, predicted investment in Alberta's oil sands was set to reach a staggering $180bn over the next decade – 20% more than was spent during the height of the last boom.

Nickel heading for major oversupply and prices could dive – Analysts

At a time of scarcity in everything from crude oil to copper to corn, nickel is heading for the biggest glut in four years, driving prices lower into 2012. Next year's surplus will rise to 60,000 metric tons from 12,000 tons in 2011, making nickel the most oversupplied metal relative to output or use, according to Bank of America Merrill Lynch, the most-accurate forecaster tracked by Bloomberg over two years.

Glencore said to be mulling $20 billion ENRC takeover

According to a detailed report in the U.K.'s Sunday times newspaper, Global mega commodities group, Glencore, which recently listed in the London stock Exchange's largest ever IPO, is considering a what appears to be a £12 billion (US$20 billion) friendly takeover of European-based diversified mining and metals company, ENRC (Eurasian Natural Resources Corporation). If such a move takes place this would convert Glencore from the world's largest commodities trading group into one of the globe's biggest integrated mining and metals companies - even without taking into account its 35% stake in Xstrata.

Alderon targets 800 million to 1 billion tonne resource at 28 to 32% iron with 2011 drill program launch

Alderon Resource Corp. (TSX.V: ADV) (OTCQX: ALDFF) is pleased to announce that its summer/fall 2011 drill program has commenced at the 100% owned Kamistiatusset (“Kami”) Iron Ore Project in western Labrador. The CDN $11 million program will consist of 26,000 metres (m) of drilling and is designed to upgrade the current resource as well as expand the known zones of mineralization and target new areas. Image by Alderon Resource Corp