Heap Leach Facilities Functions:
1. Develop, coordinate & monitor all activities related to safe operations of heap leach facilities (HLF), including permitting, design, and surveillance (including monitoring and inspection), emergency planning, and HLF management plans and procedures follow all applicable regulatory requirements or Kinross Standards for the Nevada sites.
2. Coordinate, participate, and manage the Engineer of Record (EoR) inspection(as needed) to track the performance of the HLF for Nevada sites. Coordinate, participate in, and manage EoR inspections, third party reviews, and other HLF inspections/reviews.
3. Manage & implement any & all action plans and schedules for any internal or external review reports at the Nevada sites after VP-GM approval of such action plans.
4. Support the process teams, deputy General Manager (GM) and Vice President-General Manager (VP-GM) in decision making for the HLFs.
5. Coordinate with the Director, Tailings and Environment (DTE) to ensure that corporate requirements are met.
6. Coordinate & assist the Project Superintendent on any new and/or expansion construction of the Nevada sites HLFs.
7. Manage, complete, and ensure all reporting requirements, including any action item status are completed on-time to the VP-GM & the DT.
Tailings Functions:
1. Manage, coordinate & monitor all activities related to tailings including technical aspects, safe operation, permitting, design, construction, operation, surveillance (includes monitoring and inspection), and emergency preparedness.
2. Frequently communications with the Environmental Manager, Nevada Operations to ensure that regulatory commitments are met & proactively managed & effectively communicate with site personnel regarding tailings & regulatory obligations.
3. Coordinate, participate in, and manage the agency inspections, annual EoR inspection, third party reviews, and other tailings inspections. Interact with EoR to track the performance of the tailings facility.
4. Review, update & submit as needed annually the Operation, Maintenance and Surveillance (OMS) manual, Emergency Action Plan (EAP), prior to annual dam safety inspection.
5. Coordinate with Environmental personnel water balance, management of process water, reclaim water management & seepage performance. Water balance to align with Kinross Water Management Standard.
6. Lead the Run-Out Studies for the Nevada sites: Coordinate with the EoR the development of the run-out locations, analysis assumptions & types, & the requested level of detail in modeling & run-out mapping and review with DTE prior to completing the run-out study.
7. Ensure the Nevada site Tailings management plans are following all applicable regulatory or Kinross standards requirements.
8. Manage, complete, & ensure all reporting requirements, including any action item status are completed on-time to the VP-GM & the DT.