September 8, 2022 Skeena feasibility forecasts robust returns for Eskay Creek gold-silver development in BC The feasibility study forecasts an after-tax net present value of over $1 billion and internal rate of return of 50.2% .
September 8, 2022 Denison reports expanded uranium mineralization at McClean Lake South The most significant result was 2.96% uranium oxide (U3O8) over 15.5 metres, including 24.49% U3O8 over 1.5 metres.
September 8, 2022 Moneta delivers positive PEA for Tower gold project The project's base case after-tax NPV is C$1.07 billion, with an internal rate of return of 31.7%.
September 7, 2022 Amex reports the best Perron intercept yet in northern Quebec The results are the latest batch from the ongoing multi-year 300,000-metre drilling campaign designed to expand the known mineralization of the polymetallic VMS target.
September 7, 2022 Bonterra to idle Bachelor-Moroy underground; Bachelor mill unaffected Bonterra has also released results from an additional 54 holes from the Barry drill program that will included in a new mineral resource estimate.
September 7, 2022 Granada prepares for extraction of 500-tonne bulk sample near former open pit Granada's namesake gold project is located in an established mining district 5 km south of Rouyn-Noranda and adjacent to the Cadillac Break in Quebec.
September 6, 2022 O3 Mining completes PFS for Marban Engineering gold project with increased production profile The PFS showed robust project economics including a post-tax net present value of C$463 million and post-tax unlevered internal rate of return of 23.2%
September 5, 2022 Pacific Ridge announces additional funding for Kliyul copper-gold project in British Columbia This year, Pacific Ridge plans to drill a minimum of 6,000 metres at Kliyul.
September 2, 2022 Nighthawk Gold reports new results from Colomac project in Northwest Territories Colomac Centre contains Grizzly Bear, Colomac Main, Goldcrest, and has four higher grade satellite deposits.
September 1, 2022 Colombia may require environmental licenses for mining exploration Colombia currently only requires environmental permissions for projects in the exploitation and production phases.
Weir to acquire ESCO Elecmetal Fundición Limitada for $75 million Mining technology firm to acquire the remaining 50% share of its Chile-based joint venture. December 12, 2025 | 03:32 pm