Metals Creek drills 64 metres of 1.94% copper at Tillex project in Ontario
The Tillex deposit was discovered in 1973, with a historical resource of 1.3 million tonnes grading 1.56% copper.
The new Mining Power Rankings are live. Vote for the sector’s leaders in each of the Large-, Small-, and Micro-Cap leagues.