Efficiency, reliability and total cost of ownership are all terms that are at the forefront of engineering considerations, however looking at items of equipment on an individual basis may not deliver the maximum benefits. By looking at the wider picture and combining the best technology from individual areas it is possible to achieve much more significant savings and efficiencies.
Tanzania's largest gold miner reported a 17% jump in third-quarter core profit, and said it anticipates full-year costs at the lower end of it target range of $1,100-$1,175 per ounce sold.