December 5, 2021 Large commodity customers to lean towards low-carbon emitters – report A report by SRK Consulting states that following the COP26, consumers and their host countries will be looking to the mining sector for a considerable portion of their carbon savings.
December 2, 2021 Chinese embassy calls upon citizens to leave three provinces in the DRC An attack on November 24 against an artisanal gold mine in Ituri province left four people dead, including two Chinese nationals.
December 2, 2021 Congo state cobalt monopoly aims to start buying in January In the longer term, EGC aims to buy 25,000 tonnes a year of artisanal cobalt.
December 2, 2021 Hummingbird Resources restarts Mali gold mine It said stoppage will affect full-year production, placing it below the bottom end of the expected 100,000-110,000 gold ounces range.
December 1, 2021 Tharisa annual profit more than doubles on strong platinum prices The PGM and chrome producer reported a more than two-fold jump in full-year profit on Thursday.
December 1, 2021 Gold Fields aims to cut carbon emissions by 30% by 2030 The company said its investment to decarbonise will cost about $1.2 billion until 2030,
December 1, 2021 Adoption of renewables still too slow to limit climate crisis — IEA Growth in the sector is set to hit an all-time record this year, but that's not enough to reach net zero emissions by 2050, says the agency.
November 30, 2021 Large gold miners contributed $38bn in GDP to local economies in 2020 — report In 2020, WGC members made significant contributions to local economies.
November 30, 2021 Iamgold releases infill results up to 69 g/t Au from Diakha-Siribaya in Mali Iamgold has completed drill holes totalling 19,952 metres of diamond drilling and reverse circulation drilling this year.
November 30, 2021 Botswana’s Debswana diamond sales jump 73% in first nine months of 2021 The miner, a joint venture between De Beers and the Botswana government, sells 75% of its output to De Beers.
Codelco submits $1.3B plan to prolong Radomiro Tomic mine life to 2058 The proposal aims to boost the mine's capacity to an average of 725,000 tonnes per day, up from its current level of 675,000 daily tonnes. January 14, 2026 | 10:07 am