October 14, 2021 Atalaya lifts full-year copper guidance, stock up The company now expects output to reach 54,000-56,000 tonnes for the year.
October 14, 2021 Barrick’s gold output rises nearly 5% sequentially on Argentine mine boost In the three months ended Sept. 30, total preliminary gold production rose to 1.09 million ounces, from 1.04 million ounces in the previous quarter
October 13, 2021 BC First Nations say river’s health can be restored without shutting down Rio Tinto smelter Nechako River First Nations hope for a compromise that would restore river flows without having to remove the Kenney Dam and shut down Rio Tinto’s aluminum smelter in Kitimat, British…
October 12, 2021 Breakthrough for Rio Tinto’s smelter hydropower project in British Columbia The tunnel boring machine cut 7.6 kilometres through the rock in remote mountains over 30 months, completing the route for a 16 kilometre tunnel that was started in the early…
October 12, 2021 Cassiar Gold drills bonanza grades at Carrier property in BC The best intersection was 0.4 metre grading 270 g/t gold.
October 12, 2021 Taseko reports ‘significant’ production increase in Q3, shares up The company's copper production increased by 29% over the second quarter.
October 12, 2021 Ivanhoe’s DRC copper mine to double production ahead of schedule Kamoa-Kakula Phase 2’s concentrator plant, which will double copper output, to start operations a quarter earlier.
October 12, 2021 Barrick CEO, PNG Prime Minister to meet on potential fast-track of Porgera restart Bristow hopes to speed up negotiations for the reopening of Papua New Guinea's vast open pit and underground gold mine.
October 11, 2021 Newcrest sees drop in costs, higher copper output Newcrest expects to produce around 2 million ounces of gold a year until at least 2030.
October 11, 2021 World’s top copper projects by capex — report Global copper mine production is set to expand by 7.8% y-o-y in 2021 as a result of multiple new projects coming online, says Fitch.
Taseko wraps Florence build, nears first copper output The Florence copper project in Arizona is moving from build to operations as Taseko lines up its next phase of copper growth. January 13, 2026 | 06:10 am