October 5, 2020 Teranga increases Golden Hill resource estimate Golden Hill is an advanced-stage exploration project located within the Houndé greenstone belt.
October 5, 2020 Skeena and Barrick complete transaction on Eskay Creek Once reopened, the mine will produce 236,000 ounces of gold and 5.81 million ounces of silver a year.
October 5, 2020 Eldorado Gold allowed to test drilling in northern Greece The company will conduct test drilling at its Mavres Petres deposit, part of its Stratoni silver-lead-zinc mine.
October 5, 2020 Innovation Metals to scale up REE oxides extraction technology The technology is designed for the cost-effective bulk separation and purification of rare earth elements - including both heavy REE and light REEs.
October 5, 2020 Osisko reports high-grade hits outside pit boundaries at Pine Point The drill highlights include 17.5 metres of 2.52% lead and 11.53% zinc starting at 28.5 metres; 3 metres of 0.61% lead and 8.45% zinc from 53.5 metres.
October 5, 2020 Caldas updates Juby resource in Ontario An updated resource estimate for the gold project features two open pit deposits, with a total of 21.3 million indicated tonnes grading 1.13 g/t gold, and 47.1 million inferred tonnes…
October 2, 2020 Vale in talks with Tesla, EV sector for Canada nickel Musk offered a "giant contract" if supplies could be produced in an environmentally sensitive way.
October 2, 2020 Manganese X to drill for ‘electric gold’ at Battery Hill The Canadian miner is accelerating its drilling agenda to take advantage of the current attention to manganese as a cathode component in battery chemistry.
October 1, 2020 Low-carbon future may lead to more mining in high-risk areas – study Researchers in Australia mapped the countries and regions within them that will likely become mining hotspots and where competition for resources may heat up.
September 30, 2020 License to operate still the top risk for miners – report In EY's annual risks and opportunities report, 63% of executives surveyed flagged LTO a top three risk.
Titan Mining starts graphite production at New York plant Milestone marks the first step in re-establishing a domestic natural graphite supply chain in the US for the first time in 70 years. January 26, 2026 | 04:15 pm