Latrobe Magnesium moves towards bankable feasibility study
Latrobe Magnesium Limited has completed its Pre-Feasibility Study of a plant to produce 10,000 tonnes of magnesium per annum from the brown coal fly ash at the Latrobe Valley's Hazelwood power station.
More News
Op-Ed: Recovering more metal from leach pads is mining’s quickest win
May 19, 2026 | 02:00 am
DOE issues order to keep Michigan coal-fired power plant operating
May 18, 2026 | 02:53 pm
{{ commodity.name }}
{{ post.title }}
{{ post.date }}
Comments