Casablanca: litigation possible after iron ore miner's board issue "explicit threat to shareholders: vote for the incumbent board or destroy the company".
The LME is among firms vying to take over spot price benchmark system, 30 years after being forced out by Hunt Brothers who famously cornered the market in the late 1970s.
Designed as an optimum loading tool for Cat quarry and mining trucks, specifically the 773, 775 and 777 ranging from about 60 to 100 tons (54 to 91 tonnes) capacity, the new 990K also features engine configurations to meet customer needs worldwide.
Hose pumps can circulate slurry SGs of 1.6 to 1.8 or up to 80% solid content. Only hose pumps can pump such dense fluids whilst maintaining high levels of plant availability unlike centrifugal pumps which suffer from continuous downtime and are unable to pump such high SG slurries, lower plant performance.