09 power lines
09 power lines:: Utility regulators say the state’s power transmission system is inadequate to keep up with demand and the planned upgrades are insufficient,Tuesday August 7th 2001 in Tucson,AZ. This Coal Conveyor at Tucson Electric Power’s plant on the South side of Tucson brings coal to the coal storage building. 8/7/01 Photo by James S. Wood Assn#92295
{{ commodity.name }}
{{ post.title }}
{{ post.date }}

Comments