Vancouver, British Columbia--(Newsfile Corp. - August 5, 2025) - Pacific Ridge Exploration Ltd. (TSXV: PEX) (OTCQB: PEXZF) (FSE: PQW) ("Pacific Ridge" or the "Company") is pleased to announce the initial mineral resource estimate ("MRE") for the Kliyul Main Zone ("KMZ"), just one target area at its 100% owned Kliyul copper-gold project ("Kliyul"), located in the prolific Quesnel terrane in Northcentral B.C. (see Figures 1 and 2).
Highlights
The KMZ MRE compares favourably with other recently reported MREs for B.C. porphyry deposits; it was also delineated from just one mineralized zone.
KMZ hosts 334.1 million tonnes ("Mt") grading 0.33% copper equivalent ("CuEq"), 0.15% copper, 0.26 g/t gold, and 0.95 g/t silver in the Inferred Mineral Resource category (see Table 1).
2.42 billion pounds CuEq which includes 1.11 billion pounds of copper, 2.74 million ounces of gold and 10.22 million ounces of silver in the Inferred Mineral Resource category (see Table 1).
Mineralization at KMZ remains open for expansion within and beyond the resource reporting shell used to restrict the resource model (see Figure 3).
"The initial mineral resource estimate for KMZ is an important milestone for the Company and its shareholders," said Blaine Monaghan, President & CEO of Pacific Ridge. "We now belong to a select group of B.C. copper exploration and development companies that have a significant mineral resource. I am confident that once investors compare the KMZ resource to those of our peers, they will recognize the value that Pacific Ridge currently represents."
Figure 1: Location of Kliyul and Pacific Ridge's Other Porphyry Copper-Gold Projects
To view an enhanced version of this graphic, please visit:https://images.newsfilecorp.com/files/5460/261284_a65791729499c9d5_001full.jpg
Figure 2: Kliyul Target Areas
To view an enhanced version of this graphic, please visit:https://images.newsfilecorp.com/files/5460/261284_a65791729499c9d5_002full.jpg
Table 1
KMZ MRE (CuEq)
| Cutoff (CuEq%) | Tonnes | CuEq% | Cu% | Au g/t | Ag g/t | CuEq Mlbs | Cu Mlbs | Au Oz | Ag Oz |
| 0.15 | 383,300,000 | 0.31 | 0.14 | 0.24 | 0.91 | 2,615 | 1,212 | 2,920,000 | 11,270,000 |
| 0.20 | 334,100,000 | 0.33 | 0.15 | 0.26 | 0.95 | 2,422 | 1,110 | 2,740,000 | 10,220,000 |
| 0.25 | 239,200,000 | 0.37 | 0.16 | 0.30 | 1.04 | 1,950 | 861 | 2,280,000 | 7,980,000 |
Notes for Table 1
Figure 3KMZ Pit Shell and Unconstrained Block Model at a 0.20% CuEq Cutoff
To view an enhanced version of this graphic, please visit:https://images.newsfilecorp.com/files/5460/261284_a65791729499c9d5_003full.jpg
Next Steps
Kliyul Highlights
1CuEq = ((Cu%) x $Cu x 22.0462) + (Au(g/t) x AuR/CuR x $Au x 0.032151) + (Ag(g/t) x AgR/CuR x $Ag x 0.032151)) / ($Cu x 22.0462).2AuEq = ((Au(g/t) x $Au x 0.032151) + ((Cu%) x CuR/AuR x $Cu x 22.0462) + (Ag(g/t) x AgR/CuR x $Ag x 0.032151)) / ($Au x 0.032151).Commodity prices: $Cu = US$3.25/lb, $Au = US$1,800/oz., and Ag = US$20.00/oz.There has been no metallurgical testing on Kliyul mineralization. The Company estimates copper recoveries (CuR) of 84%, gold recoveries (AuR) of 70%, and silver recoveries (AgR) of 65% based on the average recoveries from Kemess Underground, Mount Milligan, and Red Chris.Factors: 22.0462 = Cu% to lbs per tonne, 0.032151 = Au g/t to troy oz per tonne, and 0.032151 = Ag g/t to troy oz per tonne.
The technical information contained within the Kliyul Highlights section has been prepared under the supervision of, and reviewed and approved by. Danette Schwab, P.Geo., Vice President Exploration of the Company, and a Qualified Person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects.
Estimation Methods
The mineral resource estimate was completed using HxGN MinePlanTM 3D software and includes the estimation of copper, gold and silver grades into a block model (20x20x20 m) using ordinary kriged (OK) method within a 0.1 g/t Au probability shell. Composites from a minimum of two drill holes was required for a block to be interpolated with a metal grade.
Prior to estimating block grades, potentially anomalous outlier grades were identified and their influence on the grade model was controlled during interpolation through outlier restriction method. The 2 m composites were reviewed for each metal and a restricted outlier strategy was employed to limit the influence of extreme metal grades to 60 m from a composite location. The threshold grade for gold was 4.5 g/t, 1% for copper and 10 g/t for silver.
A base case resource constraining pitshell was built using HxGN MinePlanTM 3D and inputs of metal prices (US$2600/oz Au, US$4.60/lb Cu and US$30/oz Ag), metal recoveries (80% Cu, 65% Au and 65% Ag), mining costs of C$3.50/t, processing costs of C$7.0/t, G&A costs of C$3.0/t and pit slopes of 45⁰. To assess the sensitivity to metal prices, additional shells were built using gold prices between US$2000/oz and US$3200/oz, and additional copper price of C$4.10/lb and silver price of C$24.00/oz.
Inferred Mineral Resources were assigned if a block was within 150 m of a drill hole.
Qualified Person
The mineral resource estimate was completed by Susan Lomas, P.Geo. of Lions Gate Geological Consulting Inc. with assistance from Bruce Davis, PhD, FAusIMM, each of whom is an Independent Qualified Person under NI43-101 standards.
The technical information related to the mineral resource estimate in this news release has been reviewed and approved by independent QP Susan Lomas, P.Geo.
LGGC completed an audit of the project drill hole database, a review of the QAQC data for the assay results and a visit to the project site and determined the drill hole data to be of sufficient quality to support the estimation of mineral resources.
About Pacific Ridge
A Fiore Group company, Pacific Ridge's goal is to become British Columbia's leading copper exploration company. The Kliyul copper-gold project, located in the prolific Quesnel terrane close to existing infrastructure, is the Company's flagship project. In addition to Kliyul, Pacific Ridge's project portfolio includes the RDP copper-gold project, the Chuchi copper-gold project, the Onjo copper-gold project, and the Redton copper-gold project, all located in B.C. The Company would like to acknowledge that its B.C. projects are in the traditional, ancestral and unceded territories of the Gitxsan Nation, McLeod Lake Indian Band, Nak'azdli Whut'en, Takla Nation, and Tsay Keh Dene Nation.
On behalf of the Board of Directors,
"Blaine Monaghan"Blaine Monaghan President & CEOPacific Ridge Exploration Ltd.Investor Relations: Tel: (604) 687-4951Email: [email protected]Website: www.pacificridgeexploration.com News Sign up: https://pacificridgeexploration.com/contact/subscribe/LinkedIn: https://www.linkedin.com/company/pacific-ridge-exploration-ltd-pex-/ Twitter: https://twitter.com/PacRidge_PEX
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Forward-Looking Information: This release includes certain statements that may be deemed "forward-looking statements". All statements in this release, other than statements of historical facts, which address exploration drilling and other activities and events or developments that Pacific Ridge Exploration Ltd. ("Pacific Ridge") expects to occur, are forward-looking statements. Forward-looking statements in this news release include the filing of the NI 43-101 report, infill drilling and resource expansion drilling at KMZ, drill testing other Kliyul target areas, and metallurgical test work. Although Pacific Ridge believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those forward-looking statements. Factors that could cause actual results to differ materially from those in forward looking statements include market prices, exploration successes, and continued availability of capital and financing and general economic, market or business conditions. These statements are based on a number of assumptions including, among other things, assumptions regarding general business and economic conditions, that one of the options will be exercised, the ability of Pacific Ridge and other parties to satisfy stock exchange and other regulatory requirements in a timely manner, the availability of financing for Pacific Ridge's proposed programs on reasonable terms, and the ability of third party service providers to deliver services in a timely manner. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. Pacific Ridge does not assume any obligation to update or revise its forward-looking statements, whether because of new information, future events or otherwise, except as required by applicable law.
To view the source version of this press release, please visit https://www.newsfilecorp.com/release/261284
The new Mining Power Rankings are live. Vote for the sector’s leaders in each of the Large-, Small-, and Micro-Cap leagues.