St. John's, Newfoundland and Labrador--(Newsfile Corp. - May 1, 2026) - Pirate Gold Corp. (TSXV: YARR) (OTCQB: SICNF) ("Pirate Gold" or the "Company"), is pleased to announce the confirmation of a large advanced argillic alteration zone at Crippleback Lake at its Treasure Island project. The Treasure Island project in Central Newfoundland covers over 90 km of strike along the Valentine Lake Fault Zone in Canada's newest gold district.
Crippleback Lake Anomaly:
Located in the southern portion of the Treasure Island project and hosted within the Crippleback intrusive suite (Figure 1), the Crippleback Lake anomaly spans 6.5 x 1.0km and forms an electromagnetic resistivity low (Figure 2).
Drilling in 2024 along the margins of the anomaly identified broad zones of clay alteration exceeding 200 m in downhole length, with sulphide contents ranging from 1% to 8%. The clay alteration and pyrite are interpreted as the primary drivers of the geophysical anomaly.
Alteration mineralogy identified to date includes kaolinite, montmorillonite, pyrophyllite and muscovite, along with vuggy silica textures. These alteration assemblages and textures are key indicators of high-level Epithermal and Copper-Porphyry mineral systems.
The 2026 drilling program aims to further investigate the anomaly at depth and toward its core.
Crippleback Lake Drilling Highlights:
Three drill holes have been completed targeting the Crippleback Lake anomaly. Drilling continues to intersect extensive alteration zones across multiple lithologies, with consistent sulphide mineralization throughout. Below is a general summary of the drilled intervals and alteration sequences:
The Company cautions that the presence of visible mineralization is not indicative of high assay grades and that drill core samples have been submitted to a certified laboratory for analysis. Assay values for the discussed intervals will be released when available. All intervals are downhole depths, and true widths are not known at this time.
"With three holes completed testing the Crippleback Lake anomaly, we are continuing to expand our geological understanding of this system," said Greg Matheson, VP Exploration. "It is apparent we have many of the markers of a high sulphidation epithermal system, including advanced argillic alteration and core textures such as vuggy silica. Our current drilling is focused on the eastern side of the anomaly along strike of PGC-26-068 to better assess the scale of alteration. The Crippleback Lake intrusive suite remains an excellent orogenic gold target with similarities to the nearby Valentine Lake Mine, and as we await assay results, one drill has shifted to testing the 35+ km of prospective strike along the Valentine Lake Fault."
"Moosehead continues to demonstrate the kind of high-grade vein systems that drive near-term discovery, but Crippleback is a different opportunity entirely," said Denis Laviolette, Executive Chairman and CEO. "What we're seeing now is scale. Widespread alteration, strong sulphide development, and a system that is just beginning to take shape. These are the kinds of geological footprints that can point to something much larger, and that's what we're focused on defining."
Drilling is ongoing, with additional holes planned to test deeper levels of the system and further define the core of the Crippleback anomaly.
Fig. 1 - Map showing the location of the Crippleback Intrusive Suite
To view an enhanced version of this graphic, please visit:https://images.newsfilecorp.com/files/6079/295402_6ae8a2c0c4111848_001full.jpg
Fig. 2 - Map Showing drill holes PGC-26-058,064 and 068 overlaid on Airborne Electromagnetic Apparent Resistivity
To view an enhanced version of this graphic, please visit:https://images.newsfilecorp.com/files/6079/295402_6ae8a2c0c4111848_002full.jpg
Fig. 3 -PGC-26-064 - Vuggy Silica Textures with Pyrite Infill - 129.5m Downhole
To view an enhanced version of this graphic, please visit:https://images.newsfilecorp.com/files/6079/295402_6ae8a2c0c4111848_003full.jpg
Fig. 4 -PGC-26-064 - Vuggy Silica Textures with Pyrite Infill - 148.5m Downhole
To view an enhanced version of this graphic, please visit:https://images.newsfilecorp.com/files/6079/295402_6ae8a2c0c4111848_004full.jpg
*Figure 3 and 4 are not meant to be representative of mineralization in PGC-26-064
| Drill Hole | Easting | Northing | Azimuth | Dip | Length (m) |
| PGC-26-058 | 562451 | 5398587 | 345 | -65 | 602 |
| PGC-26-064 | 562724 | 5399556 | 145 | -45 | 797 |
| PGC-26-068 | 562451 | 5398587 | 345 | -44 | 596 |
Table 1 - Drill Hole Information
Pirate Gold Treasure Hunters Season 1 Episode 10 - Pyrite Gold
Episode 10 of Pirate Gold Treasure Hunters moves to Crippleback, where drilling begins to reveal the scale and intensity of a large hydrothermal system taking shape beneath the surface. The episode features:
Cannot view this video? Visit:https://www.youtube.com/watch?v=e1_uGzdDJ8Q
Subscribe to Pirate Gold's YouTube channel for weekly episodes of Treasure Hunters and follow the drill in real time: https://www.youtube.com/@PirateGoldCorp
Qualified Person
Greg Matheson, P.Geo., VP Exploration for Pirate Gold, a "Qualified Person" under National Instrument 43-101, has reviewed and approved the scientific and technical information in this press release.
About Pirate Gold Corp.
Pirate Gold Corp. is led by an experienced management team and is the dominant explorer along the Valentine Lake Fault Zone in Newfoundland, Canada's newest gold district. The Company's primary focus is its 100% owned district-scale Treasure Island Gold Project, along with a portfolio of gold projects, including the district-scale Fleur de Lys Project.
For more information, please contact:
Denis Laviolette, Executive Chairman, CEO & DirectorE: denis@pirategold.ca
Cathy Hume, VP Corporate Development & DirectorT: 416-868-1079 x 251E: cathy@chfir.com
Website: www.pirategold.caTwitter: @PirateGoldCorpFacebook: @PirateGoldCorpLinkedIn: @PirateGoldCorp
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Investors are cautioned that trading in the securities of the Company should be considered highly speculative. This news release contains "forward-looking statements" within the meaning of the applicable Canadian securities legislation that are based on expectations, estimates, assumptions, geological theories, and projections as at the date of this news release. The information in this news release about any information herein that is not a historical fact may be "forward-looking statements." Actual results may differ materially. Any statement that involves discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, future events or performance (which may, but not always, include phrases such as "anticipates", "plans", "scheduled", "believed" or "intends" or variations of such words and phrases or stating that certain actions, events or results "may" or "could", "would", "might" or "will" be taken to occur or be achieved) including statements regarding the Company's plans with respect to the Company's projects and the timing related thereto, the merits of the Company's projects, the Company's objectives, plans and strategies, and other matters are not statements of historical fact and may be forward-looking statements and are intended to identify forward-looking statements. Factors that may cause results to vary include delays in obtaining necessary approvals, changes in the market for the Company's securities, results of exploration, loss of title to properties, delays in obtaining permits or access to mineral properties, including as a result of adverse weather, fire or flood, changes to the Tax Act, rejection of expenditures as Qualifying Expenditures, and factors included in the documents filed from time to time with the Canadian securities regulatory authorities by Pirate Gold Corp. Pirate Gold Corp. will not update these forward-looking statements to reflect events or circumstances after the date hereof, except as required by law.
To view the source version of this press release, please visit https://www.newsfilecorp.com/release/295402