MCC, Jiangxi Afghan copper JV to start copper concentrate production in 2013
The first phase of the Aynak copper mining project has a design capacity of 200,000 tonnes.
{{ commodity.name }}
{{ post.title }}
{{ post.date }}
The first phase of the Aynak copper mining project has a design capacity of 200,000 tonnes.
{{ post.date }}
Comments